The Development Project for the Dorood Oilfield

The Development Project for the Dorood Oilfield

Location: The Do rood oilfield, 3 km from the Kharg Island, the Persian Gulf

Client: Iranian Offshore Oil Company (IOOC)

Contract Type: EPCI

Brief Summary: NSQ has been awarded a contract for engineering, procurement, construction and installation of a wellhead platform (D 22), subsea cables, subsea pipelines and related onshore works. The detailed SOW as below:

 

 

Jacket

Water depth:

Jacket Height:

No. of Legs:

Approximate weight:

Installation Method:

45.4 m

52 m

4

1,835 tons

Lifting

Topside

Structural Weight:

Approximate total weight:

No. of decks:

Crane Capacity:

Topside Type:

600 tons

1,200 m

5

15 tons

unmanned

Cables

 Subsea Length:

 onshore Length:

Cable Size:

No. of Cable:

7,000 m

4,000 m

300 mm2

2

Pipelines

Subsea Length:

onshore Length:

Pipeline Sizes:

No. of Cable:

10,500 m

5,000 m

6, 8 and 10 inches

3