NAFT SAZEH QESHM
    Offshore & Onshore EPCI Contractor

Location: The Drood oilfield, 3 km from the Kharg Island, the Persian Gulf

Client: Iranian Offshore Oil Company (IOOC)

Contract Type: EPCI

Brief Summary:  NSQ has been awarded a contract for engineering, procurement, construction and installation of a wellhead platform (D22), subsea cables, subsea pipelines and related onshore works. The detailed SOW as below:





The Development Project for the Dorood Oilfield (Current)

Jacket:


Water depth: 45.4 m

Jacket height: 52 m

No. of legs: 4

Approximate weight: 1,835 tonnes

Installation method: lifting

Back

Topside:


Structural weight: 600 tons

Approximate total weight: 1,200 tons

No. of decks: 5

Crane capacity: 15 tonnes

Topside type: unmanned

Cables:


Approximate Subsea length: 7,000 m

Approximate onshore length: 4,000 m

Cable size: 300 mm²

No. of cables: 2



Pipelines:


Approximate Subsea length: 10,500 m

Approximate onshore length: 5,000 m

Sizes: 6, 8, 10 inches

No. of pipelines: 3